-
Review & Site Assessment
We begin by confirming the equipment specifications, environmental requirements, and site readiness
-
Professional Installation & Setup
Our certified technicians handle the full physical installation, making sure each component is properly connected, leveled, and secured.
-
Qualification Protocols (IQ/OQ/PQ)
We perform Installation Qualification (IQ), Operational Qualification (OQ), and, if needed, Performance Qualification (PQ) to verify that equipment operates according to manufacturer & regulatory standards. All procedures are documented to meet FDA, GLP/GMP, and ISO 17025 compliance.
-
Calibration, Documentation & Handoff
Following installation, we calibrate the equipment using NIST-traceable standards, generate full documentation, and walk customers through operational protocols. We don’t leave until you’re confident using your new system.